ADKG-10 with valve skid

ADKG-10 with valve skid

  • Content is under development Centralized supplier - transparent delivery boundaries, and obligations
  • Content is under developmentUnit protection thanks to reliable ARA with AUMA intelligent explosion-proof electric drives
  • Content is under developmentCompactness thanks to competent line-up solutions for the placement of ZRA and related systems
  • Content is under developmentOptimization and economy in the design and construction of a technological line, as a result
Content is under development
Basic information

The integrated solution – a basic unit with a skid of shut-off and control valves in a mounting frame: start-up, protection and bypass without stopping the main production line.

This solution was born in an effort to minimize the CAPEX and OPEX of our clients in both onshore and offshore projects. Thanks to the concept of a “centralized supplier”, the customer gets transparent delivery boundaries and obligations, and the use of a reliable valve skid with intelligent explosion-proof AUMA actuators ensures guaranteed protection of the unit against emergency situations.

Completed projects based on ADKG-10 with valve skid
Всего агрегатов: 12
ADKG-10 Project Customer Quantity Year
ADKG-10GP 16 SOG Pestsovaya area of the Urengoy Oil and Gas Condensate Field (OGCF)LLC “Gazprom dobycha Urengoy”102008
ADKG-10Integrated Gas/condensate Processing Plant (IGPP) of Yurkharovsky OGCFLLC “NOVATEK-YURKHAROVNEFTEGAZ”92008
ADKG-10IGPP 1B, 2B Zapolyarnoye OGCFLLC “Gazprom dobycha Yamburg”72009
ADKG-10IGPP Nakhodkinskoye OGCFLLC ”Lukoil Zapadnaya Sibir”42010
ADKG-10IGPP Bovanenkovskoye OGCFLLC “Gazprom dobycha Nadym”402012
ADKG-10IGPP Kharvutinskoy ploshchadi Yamburgskovo OGCFLLC “Gazprom dobycha Yamburg”м82012
ADKG-10IGPP Yurkharovskoye GCFLLC “NOVATEK-YURKHAROVNEFTEGAZ”22013
ADKG-10SOG KS 42 YarynskayaООО “Gazprom transgaz Ukhta”222014
ADKG-10IGPP Achimovskoye OGCFPJSC "NOVATEK", JSC "Arktikgaz”42015
ADKG-10IGPP Samburgskoye OGCFPJSC "NOVATEK", JSC "Arktikgaz”72016
ADKG-10IGPP Yaro-Yakhinsky OGCFPJSC "NOVATEK", JSC "Arktikgaz”22016
ADKG-10UNTS at the Arslan IGPP«ENTER Engineering Pte. Ltd. »22019